-
Eaton Power in Focus introduction
0:39
Power In Focus virtual training features Eaton experts and our Experience Centers highlighting reliability, efficiency and safety solutions and new technologies for your power system - get PDH credits for attending.
-
Waterjet cutting services for grating products
1:16
Eaton offers custom design, cut and form safety grating products to meet your strict guidelines and tight tolerances.
-
PRE-formance prefabricated solutions
1:21
Reduce complexity, speed installation and maximize your profit with Crouse-Hinds series PRE-formance prefabricated solutions
-
Eaton's B-Line series seismic bracing cable kit system
1:22
Up to 50% faster to install, the seismic bracing cable kit system is designed to suspend equipment and other systems to help minimize damage in a seismic event. It is ideal for new and retrofit mechanical, electrical and plumbing (MEP) applications.
-
Things you will only see at Eaton's Power Systems Experience Centers
10:21
Ever wonder how electricity works? Here at Eaton's Power Systems Experience Center, you'll see first hand how electrical systems are designed and built. See unique demos like the water analogy, microgrid, harmonics, surge, UPS, supercaps and more.
-
Eaton Dual-Sliding End of Row Doors Installation Video
11:30
Installation video for Eaton’s Data Center End of Row Doors.
-
Harmonic Resonance
14:07
The Tacoma Narrows Bridge was classic mechanical resonance. This video explains a similar problem with electrical systems when capacitors are applied with harmonic loads. At PSEC, we have a great demo to show series and parallel harmonic resonance.
-
Mount fans in BA50F fastener in as little as 30 seconds
0:41
The Redi-Mount fan hanger is an octagon electrical box pre-assembled onto the t-bar fastener and includes KwikWire cable and clamps for simple, fast installation.
-
Up to 50% faster installs with BA40 QuikFix fastener
0:35
Unique design makes BA40 fastener up to 50% faster to install than typical wire-bound installation methods.
-
OSHPD OPM Pre-Approved Seismic Bracing Solutions
0:39
Reduce your project review time by OSHPD and DSA with Eaton’s preapproved OPM for health facility and education construction projects.
-
B-Line series Productivity IQ time savings solutions
0:19
B-Line series Productivity IQ newsletter and vlog are packed with time saving solutions and tools to speed your install and reduce complexity.
- Next Page