Data Centre Design
30:02
Chris demonstrates Eaton’s position as a data centre leader using a real business case for an optimised and future-ready data centre design with EnergyAware inverter, 4-hour backup battery, liquid cooling and transformer-less design. Factor in grid revenue programmes to OpEx calculations turns the data center into a revenue generating engine and, Chris argues, the equipment pays for itself.
Chris demonstrates Eaton’s position as a data centre leader using a real business case for an optimised and future-ready data centre design with EnergyAware inverter, 4-hour backup battery, liquid cooling and transformer-less design. Factor in grid revenue programmes to OpEx calculations turns the data center into a revenue generating engine and, Chris argues, the equipment pays for itself.
Related videos for "energyaware"
-
Eaton EnergyAware solution
3:37
Eaton’s EnergyAware – utnytt dine ressurser smartere
-
Eaton EnergyAware solution | Green money in gray spaces
3:37
Eaton EnergyAware solution - Green money in gray spaces
-
Eaton 93PM G2 UPS with EnergyAware
1:54
The Eaton 93PM G2 UPS builds on the success and customer value delivered by its predecessor. It has been updated with additional EnergyAware capability for frequency regulation markets which allow participation of smart controllable loads.