Multi-tenant high-rise electrical systems: Design & code considerations
12:00
Edgar Medina, Eaton Power System Experience Center (PSEC) Manager, explains how electrical power in a multi-tenant high-rise is distributed. Starting from the busway and traveling to the receptacle, Edgar also identifies NFPA 70, National Electrical Code (NEC) requirements that are required for multi-tenant high-rises. Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: http://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: http://videos.eaton.com/experience ------------------------------------------------------------------------------------------------------------------------------------------------ YouTube Chapters 00:00 - Introduction 00:58 - Busway 01:49 - Group metering main 03:38 - Surge protection device (SPD) 04:26 - Meter stacks 06:07 - Digital metering 07:28 - Elevator disconnect switch 08:38 - Load center 10:09 - GFCI 10:59 - AFCI Search terms: high-rise electrical system, electrical power system, main busway, national electrical code, NFPA 70, surge protection device, spd, multi-tenant high-rise, busway, group metering main, nec, meter stacks, digital metering, elevator disconnnet switch, afci, gfci, ashrae 90.1, elevator control, load center, series rated, electrical system, power distribution, group metering, energy code, arc-energy reduction, series rated load center, high-rise power system How is electricity distributed throughout a building? What are some NFPA 70, NEC codes required for multi-tenant high-rises? #powersystem #highrise #power
Edgar Medina, Eaton Power System Experience Center (PSEC) Manager, explains how electrical power in a multi-tenant high-rise is distributed. Starting from the busway and traveling to the receptacle, Edgar also identifies NFPA 70, National Electrical Code (NEC) requirements that are required for multi-tenant high-rises. Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: http://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: http://videos.eaton.com/experience ------------------------------------------------------------------------------------------------------------------------------------------------ YouTube Chapters 00:00 - Introduction 00:58 - Busway 01:49 - Group metering main 03:38 - Surge protection device (SPD) 04:26 - Meter stacks 06:07 - Digital metering 07:28 - Elevator disconnect switch 08:38 - Load center 10:09 - GFCI 10:59 - AFCI Search terms: high-rise electrical system, electrical power system, main busway, national electrical code, NFPA 70, surge protection device, spd, multi-tenant high-rise, busway, group metering main, nec, meter stacks, digital metering, elevator disconnnet switch, afci, gfci, ashrae 90.1, elevator control, load center, series rated, electrical system, power distribution, group metering, energy code, arc-energy reduction, series rated load center, high-rise power system How is electricity distributed throughout a building? What are some NFPA 70, NEC codes required for multi-tenant high-rises? #powersystem #highrise #power
Experience centers Similar Videos
-
Industrial communication protocols explained | Eaton PSEC
12:23
Learn about industrial communication protocols such as Fieldbus, Ethernet, and wireless communications. Understand how they operate, their features, limitations, and cybersecurity standards.
-
Impedance in power systems explained | Eaton PSEC
8:55
Impedance is a measure of how much a circuit resists the flow of alternating current (AC). High impedance means less current, leading to inefficiencies and power losses. Learn where impedance comes from and how it affects electrical systems.
-
Electrical faults explained: types, causes, calculations, and protection | Eaton PSEC
10:02
Learn about electrical faults, including short circuits, ground faults, and arcing faults and how to protect against them with circuit protection devices. Understand the importance of time current curves for safety and troubleshooting.