Multi-tenant high-rise electrical systems: Design & code considerations
12:00
Edgar Medina, Eaton Power System Experience Center (PSEC) Manager, explains how electrical power in a multi-tenant high-rise is distributed. Starting from the busway and traveling to the receptacle, Edgar also identifies NFPA 70, National Electrical Code (NEC) requirements that are required for multi-tenant high-rises. Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: http://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: http://videos.eaton.com/experience ------------------------------------------------------------------------------------------------------------------------------------------------ YouTube Chapters 00:00 - Introduction 00:58 - Busway 01:49 - Group metering main 03:38 - Surge protection device (SPD) 04:26 - Meter stacks 06:07 - Digital metering 07:28 - Elevator disconnect switch 08:38 - Load center 10:09 - GFCI 10:59 - AFCI Search terms: high-rise electrical system, electrical power system, main busway, national electrical code, NFPA 70, surge protection device, spd, multi-tenant high-rise, busway, group metering main, nec, meter stacks, digital metering, elevator disconnnet switch, afci, gfci, ashrae 90.1, elevator control, load center, series rated, electrical system, power distribution, group metering, energy code, arc-energy reduction, series rated load center, high-rise power system How is electricity distributed throughout a building? What are some NFPA 70, NEC codes required for multi-tenant high-rises? #powersystem #highrise #power
Edgar Medina, Eaton Power System Experience Center (PSEC) Manager, explains how electrical power in a multi-tenant high-rise is distributed. Starting from the busway and traveling to the receptacle, Edgar also identifies NFPA 70, National Electrical Code (NEC) requirements that are required for multi-tenant high-rises. Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: http://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: http://videos.eaton.com/experience ------------------------------------------------------------------------------------------------------------------------------------------------ YouTube Chapters 00:00 - Introduction 00:58 - Busway 01:49 - Group metering main 03:38 - Surge protection device (SPD) 04:26 - Meter stacks 06:07 - Digital metering 07:28 - Elevator disconnect switch 08:38 - Load center 10:09 - GFCI 10:59 - AFCI Search terms: high-rise electrical system, electrical power system, main busway, national electrical code, NFPA 70, surge protection device, spd, multi-tenant high-rise, busway, group metering main, nec, meter stacks, digital metering, elevator disconnnet switch, afci, gfci, ashrae 90.1, elevator control, load center, series rated, electrical system, power distribution, group metering, energy code, arc-energy reduction, series rated load center, high-rise power system How is electricity distributed throughout a building? What are some NFPA 70, NEC codes required for multi-tenant high-rises? #powersystem #highrise #power
Experience centers Similar Videos
-
Reading electrical one line drawings | Eaton PSEC
19:13
Electrical one-line diagrams are drawings that represent an electrical system by detailing the components, how they are connected, and the power flow. Watch to learn the common symbols and how to correctly read one-line drawings.
-
Circuit protection | Eaton PSEC
9:15
Circuit protection is a system of devices used to protect electrical circuits from electrical faults such as short circuits, overcurrent, and high temperature. Common circuit protection devices include circuit breakers, fuses, and protective relays.
-
TOLCO fire protection solutions | Eaton PSEC
7:41
Understand the importance of seismic bracing within fire protection systems and learn about Eaton’s TOLCO line of UL Listed and FM Approved products for fire sprinkler applications.